Technical Project Manager

Projects
Infrastructure Upgrade Project: Interior Systems Inc. Milwaukee
- January 2011 to June 2012
- NetDirect Systems LLC
Team Members: James HerrickI provided multi-skilled Senior level Technical Project Management to a Interior Systems Inc. a national retail and food services interior design and manufacturer in Milwaukee, WI. They required a complete infrastructure upgrade that included ISS servers, Enterprise class storage and Enterprise network equipment re-design and on-site design and integration services. I was able to provide a multi-skilled approach to the Technical Project Management tasks and identify any project deficiencies and implement effective solutions.
Equipment integrated:
• HP Proliant DL380G7 x8
• HP Proliant DL360G7 x2
• HP LeftHand P4500 x2
• P4000 x2
• HP Networking J series modular switches x2
Project scope:
• Site survey and technical pre-planning
• Preconfiguration services in Integration Center
• On-site implementation services and Technical Project Management
• Operational training on-site
No comments:
Post a Comment